SPECIALTY

Power Generation Equipment Cleaning

Generators, turbines and substation gear cleaned in your isolation window — no water damage, no drying time.

The problem this solves

Generators, turbines and substation gear cleaned in your isolation window — no water damage, no drying time.

Power-generation assets are revenue-critical, so a long shutdown for cleaning is costly. We only clean electrical equipment that has been isolated and proven de-energised by a licensed electrical worker, with backfeeds (UPS, generator, solar) also isolated. Dry ice keeps generators, turbines and substation equipment clean within that isolation window — no water, no drying time — extending asset life and reducing reliability incidents.

What you can expect

  • Diesel generators (de-energised)
  • Gas turbines (compressor wash supplement)
  • Substation switchgear (de-energised)
  • Hydro-electric equipment (de-energised)
See example projects
Benefits

Why dry ice for power generation

De-energised cleaning, fast turnaround

No water, no residue, no drying time — the isolation window is as short as the job allows.

No moisture into insulation

Insulation health preserved.

Process

How a typical power generation job runs

  1. 1

    Isolation & risk assessment

    Per-asset RA with your electrical authority; isolation/LOTO permit and proving-dead certificate required before we start.

  2. 2

    Targeted blast

    Critical surfaces cleaned to specification.

Surfaces & limits

Where this service works well — and the situations we'll flag for repair instead of cleaning.

Works on
  • Generators & alternators
  • Switchgear
  • Transformers (de-energised)
  • Cable trays
Doesn’t work on
  • Energised HV equipment — isolation and proving-dead required first
Pricing

Typical price for power generation

Multi-week site contracts, plant-wide programs, MRO, pharma reactors.

Enterprise tier
$6,000 – $30,000

Final price depends on condition, scope and travel. Use the quote form for a postcode-specific estimate.

Get exact estimate

Request a power generation quote

We typically respond within 24 business hours with a fixed quote.

Call 02 5302 6367 — fastest

or send the form below

Optional: tell us more for a faster quote

Typically replied to within 24 business hours.

Service-specific FAQs

Is it appropriate for substation equipment?

Yes, once isolated and proven de-energised — used routinely in substation environments under that procedure. We do not clean live substation equipment.

Ready for a power generation quote?

Send a brief for an instant range, or send us a quick brief and we'll come back within 24 hours with a fixed quote.

Or talk to us directly